Fast channel to connect Hong Kong island west, east to be commissioned on Jan. 20

          Source: Xinhua| 2019-01-07 22:53:47|Editor: Mu Xuequan
          Video PlayerClose

          HONG KONG, Jan. 7 (Xinhua) -- The first stage of a fast channel, namely Central-Wan Chai Bypass, to connect the western and eastern parts of Hong Kong island will be commissioned on January 20, said the Transport Department of China's Hong Kong Special Administrative Region on Monday.

          The existing east-west corridor on Hong Kong Island is operating beyond its capacity with serious traffic congestion. To relive existing traffic jam, the government of Hong Kong SAR commenced the construction in December of 2009, with a cost of around 36 billion Hong Kong dollars. After its opening, the fast channel will cut down travelling time between the western and eastern parts of Hong Kong island from around 40 minutes to five minutes.

          The speaker of the Transport Department, the fast channel was 4.5 km, with 3.7 km in the form of a tunnel. Besides, the tunnel of the fast channel introduced the first air purification system for use in road tunnels in Hong Kong.

          The fast channel diverted part of existing traffic to underground, which allowed commuters to reach a destination directly and alleviates traffic congestion at major thoroughfares, saving about 40 million hours of travelling time each year, equivalent to 3 billion Hong Kong dollars in economic benefit.

          TOP STORIES
          EDITOR’S CHOICE
          MOST VIEWED
          EXPLORE XINHUANET
          010020070750000000000000011105091377267571
          无码人妻一区二区三区四区av_亚洲精品911在线永久观看_精品一区二区国产在线观看_日韩不卡一区二区视频在线

                  亚洲欧美中文字幕永久有效 | 日韩精品亚洲人成在线观看 | 午夜网站在线进。 | 中文亚洲欧美日韩无线码 | 亚洲国产无在线观看 | 天天高清在线3w |